Platform Lift Construction Work

School, Warrington

First stage for the team at the Warrington School project for Pickerings Lifts was to raise the pit. The next stage our operatives were tasked with was the completion of the scrabbled back staircase and finished off with covering gaps with timber. The final stage at the Warrington School site was the making good to lift entrances i.e joinery, tilling, flooring, timber stud and decoration was completed to a high standard. 

Newton drive - Accrington

Our first task at the Newton Drive site in Accrington was the the removal of the blockwork on two floors. Our operatives then back filled the pit. Scaffold has been supplied and installed and all relevant scaff tags have been signed off. Vinyl flooring was also installed at the Newton Drive site. The final stage our operatives completed was to make good to all voids, floor, ceiling and decoration was completed to a high standard.