Since we have became Allied Lifts specialist building subcontractor in 2016, we have found Allied Lifts a great and professional company to work with. We provide a full turnkey building solution for Allied Lifts which is a specialist bespoke method that allows all aspects of building construction to run smoothly, drawing upon our wealth of knowledge within the lift industry. PRNS Building Services are eager to continue building on our relationship with Allied Lifts on a nationwide scale.

Play Video

"Based on PRNS and Allied Lifts current relationship, we don’t see this changing going forward and we will continue to use PRNS in the future."

Previous
Next

OSBORNE COURT, ST HELENS

  • Temporary hoardings x 3
  • Timber stud installed and plastered
  • Made good and decorated

NEWTON DRIVE, ACCRINGTON

  • Scaffold supplied and fitted
  • Back filled pit
  • Completely capped lift shaft for dust control
  • Removed blockwork on two floors
  • Plastering, flooring and decoration
  • Made good to all voids, flooring and ceiling
Previous
Next
Previous
Next

BOURTON ON THE WATER, GLOUCESTERSHIRE

  • Safe site set up
  • Removed concrete flooring slab
  • Pit excavation
  • Installed reinforced steels
  • Poured concrete to all necessary areas
  • Construction of the lift shaft
  • Cutting out apertures
  • Built shaft through the roof line
  • Scaffold installation
  • Installed a traditional flat roof
  • Painted lift pit
  • Plastered around the lift entrance
  • Lift entrance painted and finished

MITFORD, MANCHESTER

  • Temporary hoardings supplied and fitted to all entrances.
  • Lifting beam supplied, fitted and tested
  • Formed new lift pit
  • Concrete to be cut back to allow new lift shaft to be formed
  • Built new walls in concrete block
  • Break through existing roof and build new roof
  • Painted lift shaft and lift pit
  • Made good to all entrances
Previous
Next
Previous
Next

TOPFIELDS, MANCHESTER

  • Build up timber framing to all entrances
  • Fire stop to motor room and controllers
  • Tested and moved lifting beam
  • Cut out cills for lift entrances
  • Fit carpets to all entrances
  • Decoration
  • Made good to all landings

BARCLAY GARDENS, TELFORD

  • Safe site set up
  • Extended the lift entrances
  • Created the openings for control panels 
  • Made good to all entrances